This project example illustrates various challenges inherent in determining
Section 4(f) applicability and documenting impacts to parklands. It
presents a number of realistic scenarios that you should consider, as
though you were conducting an actual Section 4(f) evaluation.
With this project example, we will walk you through the general decision-making
process established under Section 4(f) for parkland resources and allow
you to decide which is the best alternative.
CRITERIA
Keep in mind that in order to qualify as a Section 4(f) resource,
a park or recreation area must meet the following criteria:
-
It must be publicly owned
-
It must be open to the public
-
Its major purpose must be recreation
-
It must be significant as a park or recreation area
PROJECT PURPOSE & NEED
The state transportation agency was proposing transportation improvements in a small town. The
town consisted of a main cross street, running east and west, and a
main through street, running north and south. The through street, which
served as a major commuter route for the region, was failing to provide
adequate levels of service at peak hours during the morning and evening.
The project purpose was to improve traffic capacity through the town
and decrease the number of accidents.

RESOURCES
Based on a review of existing resources within the project area, the
state transportation agency determined that there were several resources that had to be evaluated
for Section 4(f) applicability: a cemetery, a county park, a state park,
a historic farm, and a school.
From meetings and correspondence with officials with jurisdiction,
the state transportation agency discovered the following about each resource:
Cemetery - The state transportation agency consulted
with the cemetery owner and the State
Historic Preservation Officer (SHPO) to determine whether or not
the cemetery was a historic resource. They determined that it was not
on or eligible for listing on the National
Register of Historic Places (NRHP) and that it was not of local
significance. Therefore, it was not considered a Section 4(f) resource
County Park - This park was owned by the county and open to the
public. It served as a significant recreation area for the surrounding
community because of its soccer fields, tennis courts and basketball
courts. Thus, it met all four criteria for the protection of Section
4(f) parks and recreation areas, and was considered a Section 4(f) resource.
State Park - This park was owned by the state
and open to the public. Portions of it were purchased with Land and Water Conservation Fund Act (LWCFA) funds.
It served as a significant recreational area for the surrounding community
because of its picnic areas and hiking trails. Like the county park,
it met all four criteria for the protection of Section 4(f) parks and
recreation areas, and was therefore considered a Section 4(f) resource.
Historic Farm - Coordination with the SHPO confirmed
the historic significance of the farm, which was eligible for the NRHP.
Because of its eligibility, it was considered a Section 4(f) resource.
School - The school was privately owned and included
a playground that was used regularly by the surrounding community. However,
coordination with school officials confirmed that the government had
no proprietary interest in the school property (including the playground).
Although the playground was open to the public and its major purpose
was recreation, it was not publicly owned and was not considered significant
as a recreation area. It was therefore not considered a Section 4(f)
resource.
In addition to gathering information about each of these resources,
the state transportation agency staff produced written documentation on them, recording concurrent
findings with the SHPO, the local officials, and other relevant parties.
| QUESTION:
Based on the state transportation agency's coordination with the
officials with jurisdiction, do you agree that Section 4(f) applies
to all the resources that have been identified as Section 4(f) qualifiers?
What other steps might the state transportation agency consider
in identifying potential Section 4(f) resources? |
After gathering information from the various
agencies with jurisdiction, the state transportation agency made the
following recommendations to FHWA about the Section 4(f) applicability
of each resource:
| Resource |
Section 4(f)? |
Reason |
| Cemetery |
No |
No historic value |
| County park |
Yes |
Publicly owned, open to the public,
major purpose is recreation, significant as recreation area |
| State Park |
Yes |
Publicly owned, open to the public,
major purpose is recreation, significant as recreation area |
| Historic Farm |
Yes |
Eligible for NRHP (even though privately
owned) |
| School |
No |
Privately owned, despite playground
used by public; not considered significant as a recreation area |
FHWA agreed with the state transportation agency's assessment that the
county park, state park and historic farm should be protected under
Section 4(f). Coordination between the two agencies reduced the likelihood
of either party overlooking a Section 4(f) resource or mistaking a non-Section
4(f) resource for one that is protected by the statute.
ALTERNATIVES
The state transportation agency worked with town officials, environmental resource agencies,
and the public to develop four project alternatives:
No-Build Alternative This option entailed
maintenance to the existing roadway system through town and re-striping
within the town limits to allow for pedestrian crosswalks. It did not
meet the project purpose and need, but it was carried forward for further
study because it served as an avoidance alternative.
Upgrade Alternative This option
entailed widening of the existing road. In addition, it would
improve roadway geometry by providing new turning lanes throughout
the town, and it added minor improvements such as sidewalks and better
signaling and signs. It met the project purpose and need, and was
therefore carried forward for further study.
Alternative 1 This option entailed a new roadway alignment
to the east of the existing alignment. It met the project purpose
and need, and was carried forward for further study.
Alternative 2 This option entailed a new roadway alignment
to the west of the existing alignment. It met the project purpose
and need, and was carried forward for further study.

USE
The state transportation agency staff continued its coordination
with the officials with jurisdiction for each resource. They anticipated
Section 4(f) use for several resources. They examined each of the four
alternatives that were carried forward, in order to assess the probable
impacts and to see if the project could qualify for a programmatic Section
4(f) evaluation. The possibility of a programmatic evaluation was ruled
out, however, because FHWA determined that the project would require
an environmental impact statement (see criteria for programmatic
evaluations for parklands).
Here is a summary of Section 4(f) use as it applies to each of the
four alternatives that were carried forward:
No Build Alternative This option did not not require
the use of any Section 4(f) resources in the project area.
Upgrade Alternative This option
required the use of approximately 1.5 acres of land from the historic
farm and 1.5 acres of land from the state park.
Alternative 1 This option required the use of 5 acres
of land from the state park.
Alternative 2 This option required
the use of 3 acres of land from the county park.
AVOIDANCE & MINIMIZATION
Avoidance
Although the No-Build Alternative was carried forward as the Section
4(f) avoidance option, it ended up being eliminated because it did not
meet the project purpose and need. While this
alternative is not considered feasible and prudent with respect to Section
4(f), it still must be retained in the EIS as as a requirement of the
National
Environmental Policy Act (NEPA). Of the remaining optionsthe
Upgrade Alternative, and Alternatives 1 and 2none was an avoidance
alternative.
So the state transportation agency engineering
and environmental staff worked together to determine whether or not
these alternatives could be modified to avoid the affected parklands.
They explored the possibility of extending Alternative 1 to the east
so it would completely avoid the state park, but they quickly dismissed
this option because the park extended five miles to the east of the
existing alignment. By contrast, they were able to modify Alternative
2 so it completely avoided the Section 4(f) resource to the west of
the existing alignmentnamely, the county park. The Upgrade Alternative
could not be modified without significant impacts to the historic farm
and state park, because the existing roadway was so close to the resources'
boundaries.
Of the three options, Alternative 2 Modified
became the state transportation agency's avoidance alternative.

This alternative was not without its problems, however. While it avoided
the Section 4(f) county park, it displaced five houses, as well as a
section of sensitive wetlands. (Note that the wetlands would be affected
by Alternative 2, as well.)
After coordination with the Federal
Highway Administration (FHWA), the US Army Corp of Engineers, the
local planning office, and Section 4(f) officials with jurisdiction,
the state transportation agency was unable to produce an alternative
that would avoid the county park, the wetlands and the homes. Here is
a summary of the alternatives, their ability to meet the project purpose
and need, and their impacts:
PROJECT
ALTERNATIVES |
MEETS
P & N? |
SECTION
4(F)
IMPACTS |
NON-SECTION
4(f) IMPACTS |
|
| No-Build Alt. |
No |
None |
None |
|
| Upgrade Alt. |
Yes |
Farm, State Park |
Cemetery, businesses |
|
| Alternative 1 |
Yes |
State Park |
Private school playground;
2 homes |
|
| Alternative 2 |
Yes |
County Park |
Wetlands |
|
| Alt. 2 Modified |
Yes |
None |
Wetlands/5 homes |
|
Minimization
As required, the state transportation agency staff developed a plan
to minimize the Section 4(f) resources along the Upgrade Alternative
and Alternatives 1 and 2, while giving consideration to the non-Section
4(f) wetlands and houses. Minimization efforts for the Upgrade Alternative
focused primarily on the narrrowing of the typical section. For Alternatives
1 and 2 they focused on the narrowing of the typical section, as well
as minor alignment shifts.
No minimization efforts were required for Alternative 2 Modified, since
it avoided all Section 4(f) resources.
MITIGATION
Mitigation
The state transportation agency considered potential mitigation measures for the Upgrade Alternative
and Alternatives 1 and 2.
Upgrade Alternative For the state park,
the state transportation agency considered the construction of cabins
and a campground, as well as restoration of an ampitheater (not shown
on map). For the historic farm, they considered relocation of the barn,
as well as recordation of the property.
Alternative 1 Since the impacted portions of the park were
purchased or improved with LWCFA funds, replacement lands of equal or
greater value were required by the Department
of the Interior (DOI). The state transportation agency was obligated
to coordinate with state park officials in identifying other parcels
that could serve as viable replacement lands. Other mitigation efforts
for this alternative included the re-alignment of hiking trails to provide
a safer road crossing, and plantings along the picnic area to provide
a visual screen.
Alternative 2 The state transportation agency worked with
county park officials to determine which portions of the park would
be impacted and what type of enhancements or compensation were appropriate.
Options included the relocation of the ball fields and parking lot,
and plantings along the athletic fields as a visual screen.
DRAFT EVALUATION
After a thorough evaluation of the resources and coordination with
the agencies, the state transportation agency was able to develop a draft evaluation that included
the following elements:
-
Introduction
-
Description of the Proposed Action
-
Description of the Section 4(f) Resources
-
Description of Impacts
-
Avoidance and Minimization Alternatives
-
Mitigation
-
Coordination
The state transportation agency's goal was to develop a document that would (a) provide enough
data to pass an FHWA legal sufficiency review and (b) reflect the state transportation agency's
effort in coordinating with the officials with jurisdiction, the various
agencies, and other interested parties. Potential minimization and mitigation
efforts were included.
| QUESTION:
Judging by the information available, do you think Alternative 2 Modified
is feasible and prudent? |
FINAL EVALUATION
Following the agency coordination and comment period, the state
transportation agency prepared a final evaluation, which included all
the elements of the draft evaluation, plus the following:
-
A discussion of the selected alternative
- A discussion
of the basis for concluding that the proposed action includes all possible
planning to minimize harm
- Information demonstrating that the selected alternative causes the
least harm and is also feasible and prudent
- A summary
of the official coordination
- Copies
of all official coordination and a summary of other relevant Section
4(f) comments received
- A concluding
statement
SUMMARY
The state transportation agency and FHWA determined that of the five
alternatives, two of them were not feasible and prudentthe No-Build
option and Alternative 2 Modified. In addition, the complete avoidance
alternative to the east of the existing alignment (which was never fully
developed) was not feasible and prudent, either.
The No-Build option and the eastern avoidance alternative were not
feasible and prudent because they did not meet the project purpose and
needthat is, they would not improve traffic capacity through town
and decrease the number of accidents. Alternative 2 Modified was not
feasible and prudent because it resulted in unique problems and community
impacts of an extraordinary magnitudethe displacement of five
homes.
Of the three options that remainedAlternative 1, Alternative
2 and the Upgrade Alternativethe state transportation agency had
to decide which one would cause the least harm to Section 4(f) resources.
So which of these three would you recommend to FHWA as the selected
Alternative?

| |
 |
 |
|
 |
|